Case Study Category: Digital Integration & Smart City Solutions

slide 22.2

Digitizing Corporate Data Center Project – Saudi Aramco

Challenge Limited real-time visibility into data hall operations and asset health Manual monitoring across multiple systems increased response time and risk Disconnected technologies for safety, access control, asset tracking, and maintenance AIGC Solution 3D Digital Twin for real-time simulation and monitoring…

Read More
slide 23.1

Data Center Digital Twin – Digitizing Corporate Data Center Project – Saudi Aramco

Challenge Limited unified visibility across data halls, racks, and server assets Siloed IT, facilities, and engineering data made capacity and thermal planning slow Reactive issue handling for power, cooling, and rack-level constraints Manual analysis for “what-if” scenarios increased operational risk AIGC…

Read More
slide 25.1

Al-Based Smart Safety & Command Center Project – SASREF

Challenge High safety risk during turnaround and shutdown activities Manual monitoring across large, restricted industrial areas Limited real-time visibility into PPE compliance, unsafe behavior, and perimeter breaches Need for centralized control with fast incident response across the shutdown site AIGC Solution…

Read More
slide 29.2

IoT & AR/VR Implementation Project — Saudi Aramco

Challenge Limited digital tools for remote assistance, training, and field operations High dependency on manual documentation and on-site experts Difficulty in scaling immersive training and guided workflows across departments AIGC Solution Deployed PTC IoT and AR/VR platforms (Vuforia Capture, Editor, View)…

Read More
slide 28.1.3

Smart City Solution Project – Jazan / RCJY

Challenge Multiple city systems operating in silos (CCTV, utilities, lighting, EV chargers, water, BMS) No unified platform for real-time monitoring, analytics, and decision-making Complex integration of heterogeneous devices and protocols Limited visibility for city operators to manage incidents, energy, and services…

Read More
slide 27.5.2

Construction Supervision & Reality Capture at Jeddah Terminal Project – CCE

Challenge Limited real-time visibility into actual site progress versus design and project schedules Manual site documentation slowing reporting and approvals High travel and supervision costs for frequent site visits Delays in identifying deviations, rework, and coordination gaps Difficulty keeping off-site stakeholders…

Read More
slide 26.1

Smart Construction Monitoring Project at BESS – ALGIHAZ / SEC

Challenge Limited real-time visibility into worker movement, productivity, and site safety Inefficient deployment of manpower and heavy equipment across a large construction site Idle time and underutilization of machinery impacting timelines and cost Manual tracking of materials leading to delays and…

Read More
slide 24.1.2

Integrated Industrial Digital Data Platform Project – Marafiq

Challenge Data silos across SCADA, DCS, PLCs, MES, and enterprise systems at multiple utility plants Limited real-time visibility from plant edge to corporate operations Difficulty scaling analytics securely across Jubail and Yanbu High dependency on custom code for integrations and reporting…

Read More