Case Study Category: Smart Cities

slide 22.2

Digitizing Corporate Data Center Project – Saudi Aramco

Challenge Limited real-time visibility into data hall operations and asset health Manual monitoring across multiple systems increased response time and risk Disconnected technologies for safety, access control, asset tracking, and maintenance AIGC Solution 3D Digital Twin for real-time simulation and monitoring…

Read More
slide 23.1

Data Center Digital Twin – Digitizing Corporate Data Center Project – Saudi Aramco

Challenge Limited unified visibility across data halls, racks, and server assets Siloed IT, facilities, and engineering data made capacity and thermal planning slow Reactive issue handling for power, cooling, and rack-level constraints Manual analysis for “what-if” scenarios increased operational risk AIGC…

Read More
slide 13.1

AI Based Video Surveillance – Digitizing Corporate Data Center Project – Saudi Aramco

Challenge Manual surveillance limited real-time awareness across large data center facilities Delayed detection of safety violations, fire, smoke, and abnormal human behavior Slower incident response due to fragmented monitoring systems AIGC Solution AI-powered video analytics integrated with VMS and edge computing…

Read More
Screenshot 2026-01-16 033613

Master Data Management (MDM) for Inventory Optimization Project – Algihaz Holding

Challenge Duplicate records and inconsistent data. Increased procurement costs and extended approval cycles. Difficulty in tracking changes, compliance, and inventory accuracy. AIGC Solution Catalogue Standardization using Sphera’s Standard Modifier Dictionary (SMD). Governance & Compliance:Data governance practices to control creation, modification, and…

Read More
slide 29.2

IoT & AR/VR Implementation Project — Saudi Aramco

Challenge Limited digital tools for remote assistance, training, and field operations High dependency on manual documentation and on-site experts Difficulty in scaling immersive training and guided workflows across departments AIGC Solution Deployed PTC IoT and AR/VR platforms (Vuforia Capture, Editor, View)…

Read More
slide 28.1.3

Smart City Solution Project – Jazan / RCJY

Challenge Multiple city systems operating in silos (CCTV, utilities, lighting, EV chargers, water, BMS) No unified platform for real-time monitoring, analytics, and decision-making Complex integration of heterogeneous devices and protocols Limited visibility for city operators to manage incidents, energy, and services…

Read More
slide 27.5.2

Construction Supervision & Reality Capture at Jeddah Terminal Project – CCE

Challenge Limited real-time visibility into actual site progress versus design and project schedules Manual site documentation slowing reporting and approvals High travel and supervision costs for frequent site visits Delays in identifying deviations, rework, and coordination gaps Difficulty keeping off-site stakeholders…

Read More
slide 26.1

Smart Construction Monitoring Project at BESS – ALGIHAZ / SEC

Challenge Limited real-time visibility into worker movement, productivity, and site safety Inefficient deployment of manpower and heavy equipment across a large construction site Idle time and underutilization of machinery impacting timelines and cost Manual tracking of materials leading to delays and…

Read More